  • St. Vincent Fishers Hospital, Fishers, Indiana

    PROJECT: St. Vincent Fisher Hospital, Fishers, Indiana
    Facility Director – Victor DeTienne
    Representative – AB Young Company, Byron Koch

    EQUIPMENT:
    • Two VMP-50 LE Steam Boiler Skid Mounted with a boiler feed system and blow down separator and Mod Sync Control panel
    • SN # 116416-FBW
    • 116294-FBW-REV B
    • Steam requirement for Surgery Autoclaves and Building Humidification, Dual Fuel fired, 150 psig design, operating pressure 80 psig, Boilers, Knockdown Skidded system.

    The project presented a challenge due to the fact that St. Vincent required a knockdown steam system in order to get in the existing location, where before they had Two ICS-20 steam boilers. The hospital determined they needed addition steam capacity. Unfortunately, there was no physical space to get the boilers into the same space as the ICS-20 boilers existed before. ybhs schoolloop Fulton provided the solution with a knock down steam boiler package. corporate directory In the photos you can see challenge we faced locating the new boilers in an area that housed a building column. We also incorporated (3) Vantage 2000 Condensing boilers with Low Nox capability in this mechanical space.

     

    St vincent 2st vincent 1St vincent 3

     

    CONSULTING ENGINEER: BSA LifeStructures, Indianapolis, IN, Kevin McNutt, PE
    INSTALLING CONTRACTOR: Leach & Russell Mechanical Contractors, Fishers, IN
    PROJECT ENGINEER: Andy Smith